Please see below a selection of our completed projects

6cc
20140826_123734
20141220_154123
20140826_123921
20141220_154117
0[1]
IMG_0083
IMG_0080
IMG_0140
IMG_0141
IMG_0012
0[4]
IMG_0173
IMG_0172
image3
image1_1
image2
6cc
previous arrow
next arrow
6cc
20140826_123734
20141220_154123
20140826_123921
20141220_154117
0[1]
IMG_0083
IMG_0080
IMG_0140
IMG_0141
IMG_0012
0[4]
IMG_0173
IMG_0172
image3
image1_1
image2
6cc
previous arrow
next arrow

New Build

Spa Villa

Location: Torquay

Duration: 36 month

Yet another green field site located on one of Torquay’s many hills.

The development involved construction of a 5 storey building consisting of 8 luxury apartments, with balcony and a large penthouse on the top floor.

The site required a huge amount of ground clearance and ground work before foundations and services could be installed. The foundation work required piling and ground beams in order to support the building.

Due to the number of floors, a steel structure had to be constructed in order to comply with regulation specifically, ‘progressive collapse’.

Another major challenge with this site, was the sheer volume of work required to complete a large area of boundary walls.

This building project was completed in 36 months despite some delays with architects and planning authorities.

Refurbishment

Foxgloves Retreat

Location: Torquay

Duration: 18 month

The development consisted of 2 bedroom main house with huge conservatory and a self contained 1 bedroom flat. In the middle of the grounds a pergola / relaxation area with sauna/steam room, hot tub and bio-ethanol fire island - all under retractable roof. On top of the grounds a self contained Chalet. Several sun-decks and stairs and boundary walls across all grounds.


Project was successfully completed in 18 Months and

the Foxgloves Retreat is now open for visitors via AirBnB.

Drone-4
Drone-3
Outdoors-10
Outdoors-09
Outdoors-17
Outdoors-16
Outdoors-15
Outdoors-14
Drone-1
Drone-2
Outdoors-13
Outdoors-07
Outdoors-08
Outdoors-01
Outdoors-03
Outdoors-06
Outdoors-04
Outdoors-05
Outdoors-12
Walkways-6
Walkways-5
Walkways-1
Spa-3
Spa-1
Kitchen 2-11
Kitchen 2-10
Kitchen 2-09
Kitchen 2-08
Kitchen 2-06
Kitchen 1-07
Kitchen 1-10
Kitchen 2-01
Kitchen 1-06
Kitchen 1-04
Kitchen 1-03
Kitchen 1-02
Conservatory-15
Conservatory-14
Conservatory-12
Conservatory-09
Bedrooms-9
Bedrooms-8
Bathrooms-6
Bedrooms-1
Bedrooms-4
Bathrooms-4
Bathrooms-3
Bathrooms-2
Bathrooms-1
previous arrow
next arrow
Drone-4
Drone-3
Outdoors-10
Outdoors-09
Outdoors-17
Outdoors-16
Outdoors-15
Outdoors-14
Drone-1
Drone-2
Outdoors-13
Outdoors-07
Outdoors-08
Outdoors-01
Outdoors-03
Outdoors-06
Outdoors-04
Outdoors-05
Outdoors-12
Walkways-6
Walkways-5
Walkways-1
Spa-3
Spa-1
Kitchen 2-11
Kitchen 2-10
Kitchen 2-09
Kitchen 2-08
Kitchen 2-06
Kitchen 1-07
Kitchen 1-10
Kitchen 2-01
Kitchen 1-06
Kitchen 1-04
Kitchen 1-03
Kitchen 1-02
Conservatory-15
Conservatory-14
Conservatory-12
Conservatory-09
Bedrooms-9
Bedrooms-8
Bathrooms-6
Bedrooms-1
Bedrooms-4
Bathrooms-4
Bathrooms-3
Bathrooms-2
Bathrooms-1
previous arrow
next arrow
plympton
plympton0
plympton1
plympton-complete
previous arrow
next arrow
plympton
plympton0
plympton1
plympton-complete
previous arrow
next arrow

New Build

Plympton

Location: Plympton

Duration: 9 month

This development consisted of 4 town houses, which was a very straight forward development and didn’t present any real challenges.

The project was completed within 9 months and once again the developer sold all houses off plan.

New Build

Tor Manor

Location: Torquay

Duration: ongoing

This is our current development, consisting of 9 town houses, 6 of which are 3 storey buildings,

with balcony and sea views.


The main challenge with this project was supplier lead, in that our timber frame company let us down at the 11th hour, which meant we had to quickly adapt by finding another solution.


We therefore reverted to a traditional build, our preferred way of building.


The entire project is near completion and a number of the house are already under offer.

IMG_2199-cleaned
IMG_0354
IMG_1521-1
IMG_0392
IMG_0394-710x533
IMG_0678
IMG_2200
IMG_2198
IMG_2199-cleaned
previous arrow
next arrow
IMG_2199-cleaned
IMG_0354
IMG_1521-1
IMG_0392
IMG_0394-710x533
IMG_0678
IMG_2200
IMG_2198
IMG_2199-cleaned
previous arrow
next arrow
torquay-drop-kerb-block-pavia
Paignton-Drop-kerb-porecelene-tile-driveway
redbrook-before
redbrook-in-progress
redbrook-completed
churston-tarmac2
churston-tarmac1
calstock-resin2
calstock-resin1
calstock-resin3
previous arrow
next arrow
 
torquay-drop-kerb-block-pavia
Paignton-Drop-kerb-porecelene-tile-driveway
redbrook-before
redbrook-in-progress
redbrook-completed
churston-tarmac2
churston-tarmac1
calstock-resin2
calstock-resin1
calstock-resin3
previous arrow
next arrow

Driveway Projects

Locations: Torquay, Paignton, Calstock, Churston

Duration: Quick Projects completed to quoted timescales.

Here's a few of the many Driveway projects we have completed.

  1. Torquay - Installation of drop kerbs and Block Pavia driveway to enable additional parking.
  2. Paignton - Installation of drop kerb to create additional parking and new porcelain tiled driveway.
  3. Paignton - Extension of driveway, Installation of new edging kerbs and Block Pavia driveway.
  4. Churston - Extension of front driveway and installation of tarmac.
  5. Calstock - Installation of drop kerbs, new Resin driveway and Steps to front door.

All Projects finished on time and to complete customers satisfaction.


New Build

Sunny side cottages

Location: Ivybridge

Duration: 14 month

The development consisted of 6 terraced town houses.

The Site was a former vehicle repair and maintenance business which meant

demolition of the existing building and in particular, removal of oil & petrol tanks

required very clear compliance with legislation.


Project was successfully completed in 14 Months and once again,

all houses were sold off plan by the developer.

sunnyside_complete
sunnyside-cottages-before
20130919_093809
sunnyside7
sunnyside_complete
previous arrow
next arrow
sunnyside_complete
sunnyside-cottages-before
20130919_093809
sunnyside7
sunnyside_complete
previous arrow
next arrow
thearches4
The-Arches-Tavistock-site
The-Arches-Tavistock-complete
previous arrow
next arrow
thearches4
The-Arches-Tavistock-site
The-Arches-Tavistock-complete
previous arrow
next arrow

New Build

The Arches

Location: Tavistock

Duration: 9 month

The site was originally a row of garages which we developed into a block of 5 Apartments, located directly adjacent to the viaduct in Tavistock


The development required careful excavation in order to install foundations and required particular care and attention in planning and organisation incoming deliveries and day to day logistics, due to restriction on working space.


The building was completed in 9 Months and the developer managed to sell all apartments off plan.

New Build

Looe

Location: Looe, Cornwall

Duration: 20 Days

This development of a two storey property over looking the Sea at Seaton, Looe, Cornwall.


We were initially asked to build some retaining walls in readiness for ground work and foundations however ended up completing all of the foundations and sole plate for the timber frame to sit on.


Following completion of the the timber frame, we then prepared the ground floor for screeding and completed all the random stone work on the front of the building, and block work on the other elevations.

seaton-looe-project2
seaton-looe-project1
previous arrow
next arrow
seaton-looe-project2
seaton-looe-project1
previous arrow
next arrow
Torquay-demolition-reparation-works-IMG_2610
Torquay-demolition-reparation-works-IMG_2654
Torquay-demolition-reparation-works-IMG_2655
Torquay-demolition-reparation-works-IMG_4784
Torquay-demolition-reparation-works-IMG_4785
Torquay-demolition-reparation-works-IMG_4824
Torquay-demolition-reparation-works-IMG_4747
Torquay-demolition-reparation-works-IMG_4938
Torquay-demolition-reparation-works-IMG_4955
Torquay-demolition-reparation-works-IMG_4981
previous arrow
next arrow
Torquay-demolition-reparation-works-IMG_2610
Torquay-demolition-reparation-works-IMG_2654
Torquay-demolition-reparation-works-IMG_2655
Torquay-demolition-reparation-works-IMG_4784
Torquay-demolition-reparation-works-IMG_4785
Torquay-demolition-reparation-works-IMG_4824
Torquay-demolition-reparation-works-IMG_4747
Torquay-demolition-reparation-works-IMG_4938
Torquay-demolition-reparation-works-IMG_4955
Torquay-demolition-reparation-works-IMG_4981
previous arrow
next arrow

Demolition of Bridge / Walkway

Location: Torquay Town Centre

Duration:

This project involved the removal of a second floor walkway originally built in the 1960’s as part of the old Marks & Spencer, now Primark located in the High street in Torquay

Integrum Construction Ltd.

Company number: 12811164

36 Redbrook Close,

Paignton,

Devon, TQ4 7NU

Tel: 01803 844683, 07970 058044, 07951 344418

Email: info@integrumconstruction.co.uk

©2024 All Rights Reserved – Integrum Construction Ltd. | Privacy Policy